The goal of this study was to evaluate the contamination present within the walls of this motorway underpass.
Unsere Referenzen
Nos références
REFERENSER
Paudèze stream culvert
This study concerned the masonry vault of the stream culvert as well as two overlying retaining walls including a cantilevered walkway.
Criblette & Chauderon
The objective of this study was to evaluate the presence of water within the concrete originating for the rocks of the tunnels.
Parking Geneva
Bridgology was assigned to process the GPR data of a public parking in Geneva.
Ernen
Bridgology was contacted by a local consulting office to further investigate the condition assessment of the upper deck of this multi-story car park in the canton of Wallis.
Pont du Landar
Pont du Landar in Lavaux region was a typical “condition assessment before maintenance work” mission.
Bridge in UK
Prior to the removal of the pavement on this highway bridge in Central England, our client needed an estimate of the volumes to be removed. Thanks to our non-destructive measurements, we were able to provide results in a short period of time.
Biel
This bridge in Biel area was inspected in collaboration with VSL. The goal of this study was to assess the condition of the bridge deck and the PT system present within the beams.
BRIDGOLOGY
Le Grand-Chemin 73
Epalinges, CH-1066
T +41 79 297 40 54
info@bridgology.com
©Bridgology 2021
Designed by Swiss Backstage
Designed by Swiss Backstage | ©Bridgology 2024
Designed by Swiss Backstage | ©Bridgology 2024
Designed by Swiss Backstage | ©Bridgology 2024
Håll dig uppdaterad
Designed by Swiss Backstage | ©Bridgology 2024
BRIDGOLOGY
Drottning Kristinas väg 53
114 28 Stockholm – Sverige
T +41 79 297 40 54
info@bridgology.com