...
The goal of this study was to evaluate the chemical contamination of the walls of this motorway underpass.

 

The rebar spacing, concrete cover, contamination and corrosion risk were mapped.

It was concluded that there was no major contamination within the structure. Some local hotspots were detected, it was found that they were due to water running through cracks.

Rebar density

Corrosion risk

Contamination map

Concrete cover

More information ?

BRIDGOLOGY

Le Grand-Chemin 73
Epalinges, CH-1066

T +41 79 297 40 54
info@bridgology.com

©Bridgology 2023
Designed by Swiss Backstage

Designed by Swiss Backstage | ©Bridgology 2024

Användningsområden

 

    BRIDGOLOGY

    Drottning Kristinas väg 53
    114 28 Stockholm – Sverige

    T +41 79 297 40 54
    info@bridgology.com