+41 79 297 40 54 info@bridgology.com

Our references

Bridgology has finished multiple projects in recent years. The summer period is considered our peak season, we received many assignments. Take your time here to go into deep dives on each of these projects we have completed.

Paudèze Viaduc

Paudèze Viaduc

Pont sur la Paudèze in Lavaux region was a typical “condition assessment before maintenance works” mission. We focussed on the detection of contaminated regions on the bridge deck.

read more
Pi Chardonne

Pi Chardonne

The goal of this study was to evaluate the contamination present within the walls of this motorway underpass.

read more
Estacade Paudèze

Estacade Paudèze

In this study, we observed the composition, the geometry of a retaining wall and a tunnel. The objective of this study was to evaluate the presence of water within the concrete originating from the rocks of the tunnels.

read more
Parking Geneva

Parking Geneva

Bridgology was assigned to process the GPR data of one of the parking lots in Geneva. Our client has inspected the structure composed of an asphalt layer and forwarded us the GPR data to be further processed. The goal was to evaluate the condition of the parking slabs.

read more
ERNEN

ERNEN

Bridgology was contacted by a local consulting office, which is specialized in non-destructive surveys, to further investigate the condition assessment of the upper deck of this multi-story car park in the canton of Wallis.

read more
Pont du Landar

Pont du Landar

Pont du Landar in Lavaux region was a typical “condition assessment before maintenance works” mission. The main focus was lying on the detection of contaminated regions on the bridge deck.

read more
BRIDGE IN UK

BRIDGE IN UK

Prior to the removal of the pavement on this highway bridge in Central England, our client needed an estimate of the volumes to be removed. Thanks to our non-destructive measurements, we were able to provide results in a short period of time.

read more
Biel

Biel

This bridge in Biel area was inspected in collaboration with VSL. The goal of this study was to assess the condition of the bridge deck and the PT system present within the beams.

read more

BRIDGOLOGY

Le Grand-Chemin 73
Epalinges, CH-1066

T +41 79 297 40 54
info@bridgology.com

©Bridgology 2021
Designed by Swiss Backstage